Why Did the US (Mostly) Go With LMP? Benefits of Flow‐Based AllocationPosted on 27 January 2014 by EPRG Admin • 0 CommentsBenjamin F. Hobbs and Karsten Neuhoff: Why Did the US (Mostly) Go With LMP? Benefits of Flow‐Based Allocation Workshop on the Role of Power Market Design for the Achievement of the 20% Renewable Target, Brussels Presented 10 June 2010 | Download PDF
Sorry, comments are closed for this post.